Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Deutsch |Pусский |
| No.9657575
![](http://i.b2b168.com/e/tag_pthy.gif)
- Product Categories
- Friendly Links
Information Name: | Shilong hand molding machine import declaration |
Published: | 2013-06-29 |
Validity: | 30 |
Specifications: | |
Quantity: | 1.00 |
Price Description: | |
Detailed Product Description: | Shilong hand molding machine import declaration, Shilong hand molding machine import declaration Tiger Bridge dedicated docking large enterprises import projects to help businesses sort out the cumbersome import procedures, processes, giving enterprises the most professional import packaged plan. A second-hand machinery import costs: Hong Kong part: for a single fee, port charges, delivery charges, warehouse rental, the inspection fees and daili fees, transit fees, Dongguan components: customs duties, VAT, and for a single pier, customs fees, domestic customs clearance, commodity inspection fee, Hong Kong to Dongguan transportation costs, the old electromechanical filing fees, the old electromechanical licensing and certification fees, daili fees, other costs. Second, imports of machinery and processes: to provide information ------ old electromechanical import mechanical and electrical permits (11-13 days) ------- Hong Kong Inspection Application (3-6 days) ------- Hong Kong the inspection (3-4 days) ------ Guangzhou Huangpu Port (3-6 days) ----- ------ customs at trial out of a single ------ jiaoshui ---- - release (3-4 days) ------ goods sent to the customer designated locations Third, import of used machinery and procedures: Preparation: 1, the applicant, consignee, consignor business license. 2, the proposed import of used mechanical and electrical products list (name, code, quantity, specifications, origin, date of manufacture, the manufacturer, the old and new state, price, usage, etc.) cover seal a duplicate. 3, the device color photos. 4, the import of used mechanical and electrical products for the record (electronic version) as the advanced equipment needed for the permit, the required information: 1, 2 application forms, application report (detailed written report on the basic situation of enterprises, production, import equipment uses, manufacturing date, age, present condition, such as an earlier production date must make a special note) 3, equipment testing, must be issued by national testing agencies or equipment suppliers to provide the test report. 4, the business license, certificate of approval (foreign-invested enterprises are required to provide) 5, Listing 6, 7 color photo equipment, work contact list. Dongguan tiger Bridge International Freight Forwarding Co., Ltd. & Shenzhen Tiger Bridge International Logistics Co., Ltd. (280 Integrated Logistics, provide the coastal port of import logistics liaison services) Contact: Huang Sheng Tel 0769 -2202344 Fax 0769 -89,830,099 Mobile : 13713056848 Website: http://detail.b2b.cn/trade/722/51/90/722519087.htm mail: 1772207882@qq.com |
Admin>>>
You are the 6927 visitor
Copyright © GuangDong ICP No. 10089450, Tiger Bridge Cargo Ltd. of Dongguan City All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 6927 visitor
Copyright © GuangDong ICP No. 10089450, Tiger Bridge Cargo Ltd. of Dongguan City All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility